Construction of 6 power boards for crossings, and lighting for crossings.
Construction of Lotus Timber’s medium and low voltage network and a substation.
Construction of approx. 3 km of a 10 kV cable line; construction of approx. 1.3 km of a 10 kV overhead line.
Replacement of the KP overhead line with approx. 11 km of a cable line; installation of 6 sets of a 10/0.4 kV substation.
Construction of street lighting, a substation, switchboards and communication lines.
Reconstruction of a KP aerial line, replacement of bare cable with BLL covered cables - 9.9 km, replacement of KP masts - 133 pcs, installation and construction of substation’s buried cable lines.
Design and replacement of the traction transformer and rectifier, delivery of the transformer and rectifier, and their installation and tuning works at the Raasiku substation.
0.4-35 kV electrical network’s construction and maintenance works, fault elimination and the provision of operational services.
Carrying out maintenance works of regional and distribution substations and Prangli diesel power plant in the region of northern and western Estonia (including the islands)
Preparation of initial tasks, repair and construction designs for the customer, execution of construction and maintenance works (including maintenance works of line corridors) for the 0.4-35 kV electrical network, faults elimination and the provision of operative services.
Construction of street lighting (120 LEDs) and its electrical supply.
Construction of street lighting (120 LEDs) and communication lines.
Updating of 680 LED lighting points, 3.8 km of new buried cable lines were built, 13.6 km of overhead lines were updated, 3 street lighting control boards with a central remote control system were updated and 9 new ones were installed.
Updating of over 1,300 LED lights, 15 km of new buried cable lines were built, 20 km of overhead lines were updated, 18 new street lighting control boards with a central remote control system were installed.
Renovation of the street lighting network with 614 LED lights in Kehra Town, Lehtmetsa Village and Ülejõe Village.
Renovation of the street lighting network with 183 LED lights in the villages of Alu, Kuusiku and Kodila.
Reconstruction of the street lighting network with 621 LED lights in Tallinn, for the Ehitajate and AH Tammsaare tee thoroughfares.
Renovation of about 350 LED lights in five settlements of Saaremaa.
Landing site lighting, video surveillance and automation works.
Renovation of the street lighting network with 346 LED lights in Lihula city, Tuudi and Kirbla villages. In addition, construction of 10 km of buried cable lines and 115 household entries on behalf of Imatra Elekter AS.
Installation of 509 LED lights; 17 km of buried cable lines were built, and 11 control boards were installed.